null

Fire Extinguisher Location. Location of Emergency light .Exit light, Fog light & Industrial light. Fire Alarm and Detection DrawingCall Point, Alarm Bell. Location of Emergency Exit & Fire Rated Door. Standpipe System Drawing Location of Hose Box, Landing Valve. Pillar Hydrant, Fire Bridge Connection

null

UGWR , Fire Pump & Layout Location of Assembly point, First Aid Box, Electrical DB’s, Fire Brigade car Parking, Visual Alarm, Car Parking Area. Location of TX Room, Generator Room, Boiler Room, Storage Area, Refuge Area , Fire Command Room. LPS and Floor Escape Route Drawing.

null

Fire Suppression Drawing. Annunciation location. PA System Location. Building Information Roof Top Drawing (Including: Lift M/C. Room, Roof Slop, Overhead Water Reservist ) Main Natural-gas Supply Shut-off. Report of Earth Resistance, Insulation. Resistance Report. Inspection and Maintenance Report of Fire Alarm and Detection,. Standpipe, Hose System, Fire Pump, Log Book.